Client Project

Management of the Laboratory Equipment Relocation Process

Identify all the steps required to relocate laboratory equipment and develop a corresponding project management plan.

Gestion du processus de déménagement d'équipement

context

Our client, a major French laboratory with operations around the world, is looking for a solution to manage the relocation of equipment from several laboratories to a single new building.

To manage the various stages of these transfers, our client wants to replace Excel spreadsheets with a comprehensive, intuitive, and easy-to-use tool. The project began in 2019 and is expected to be completed in 2024.

GxpManager therefore embarked on this project by creating a GxpXL prototype and helping to define the process to be implemented for managing equipment transfers.

The working group that was established consisted of fewer than 10 people in order to represent the various stakeholders involved in the move.

The customer's need

Step 1: Identify all the steps required to relocate equipment and develop a corresponding project management plan.

Step 2: Develop a simple, user-friendly tool—avoiding the implementation of workflows, for example.

The solution must enable users to easily manage the various activities using a variety of powerful metrics. It must facilitate the traceability of equipment through the management of labels that include an identifier and information on origin and destination.

Data entry forms should minimize manual data entry to promote standardization and prevent errors (data integrity). They are optimized to facilitate the entry of the extensive information associated with equipment.

The management module must be able to integrate information from SAP on an ad hoc basis.

Definition of the Solution

Implementation of the custom GxpXL module was completed in two sessions, enabling the creation of a prototype of the expected module.

The project was structured into three sprints carried out over three months during the lockdown period. During the sprints, key users were able to align their requirements with the capabilities of the GxpXL platform, then test and refine the module based on feedback.

The module allows equipment to be grouped into batches and enables tracking of their status from the point of departure to the point of arrival.

The Results

The module enabled the client to:

  • Increase Productivity
  • Optimize equipment and batch tracking
  • Make it easier to enter and search for information about a batch or piece of equipment
  • Track all modifications, deletions, and additions to information using the audit trail
  • Extract data in standardized and controlled formats
  • Manage the entry of required information
  • Use the entered data to generate reports in Word, PDF, or Excel formats, depending on user permissions
  • Secure access to the application and its content with granular controls
  • Access summaries and metrics on activity
  • Provide an overview of relocation activities

The GxpManager module used

Icon representing a web window with GxpXL script

GxpXL

Custom Module

Custom Module: GxpXL

GxpXL enables the digitization of Excel files to meet the requirements and recommendations applicable to electronic records, electronic signatures, and computerized systems: FDA 21 CFR Part 11, GMP Annex 11, and GMAP 5.

The GxpManager platform includes powerful features: compliance, traceability, security, flexibility, reporting, and analytics. It allows you to create custom modules tailored to your specific challenges and needs.

The module adapts to business logic and aligns with the organization and its processes. We assess your needs and translate business processes into custom modules. Thanks to its agile platform, users are more actively involved in the creation, evolution, and continuous enhancement of the modules.